In the previous post, I mentioned five different steps in the migration life cycle of a target cloud database. These steps are,
- Discovery
- Analysis
- Planning
- Migration
- Validation
Let’s look at the very first step- Discovery.
The discovery phase consists of collecting source database information such as:
- Database version
- Database size
- Operating system
- Endian-ness of the database
- Database links
- Database character set
- Data types used in the source database
- Business dependency: Applications may have monthly or quarterly releases and the migration must be completed before that. In such cases, you must select the faster approach for migration.
- Resourcing: Business dependency and resourcing go hand-in-hand. If the migration is critical and must be completed within a stipulated time, resources working on the cloud migration must be enhanced.
Let’s take an example of a sample database.
The following is some of the information you would collect during the discovery phase of an on-premises database, which needs to be migrated to Oracle Cloud Infrastructure DB VM System:
- Database version: 12c Enterprise Edition Release 12.2.0.1.0 (64-bit Production)
- Database name: Pluggable database name – PDB1, container database name – ORCL
- Database size: 2 GB
- Operating system: Linux 3.8.13-26.2.1.el6uek.x86_64
- Endian-ness of the database: Little endian
- Database links: None
- Database priority: Development, non-critical
- Memory structure: SGA – 2.5 GB, PGA – 2 GB